Interior design software for multi-family & build-to-rent

Three hundred units.
Six unit types. One schedule.

Multi-family is not a big residential project. It is six packages specified once and delivered three hundred times, in stages, against a durability floor that is the business model rather than a preference. Workroom holds the unit type as a record, so a change lands on every unit carrying it instead of on a spreadsheet somebody has to remember to update.

Studio DashboardSetup guide People ContactsEmailComms Projects All ProjectsWalter Residence+ View all Management ProductsWork in ProgressTimelogsAutomationsCalculatorsLink ManagementMood Content FormsDocumentsContracts Finance Finances
Products Search products, rooms, categories, vendors… Product Manager Group By Export Import + Add product
ItemStatusDetailsFinancialsProcurementTracking
Molecule chandelier
Molecule ChandelierChandelierZapata Residence
Sourcingwholesale4–6 weeks
Dining RoomLightingClipper
Unit cost$1,000Vndr dsc40%Qty2Margin60%Client total$3,681.80Profit$1,800
ApprovedJul 22PO sentJul 18Est. deliveryJul 11
No carrier yet
Sub-items (1)
Volière bird pendant by Mathieu Challières
Volière Pendant, BirdPendantRobin Residence
ProposedNo tags configured4–6 weeks
Dining RoomLightingMathieu Challières
Unit cost$2,500Qty2Client total$14,416.80Profit$7,500
ApprovedJul 22PO sentJul 18Est. deliveryJul 11
No carrier yet
Grove dining table in whitened oak by Acre Made
Grove Dining Table, Whitened OakDining TableProject C
BackorderedNo tags configured8–10 weeks
Dining RoomFurniture » TablesAcre Made
Unit cost$4,200Qty1Client total$6,510.48Profit$2,186.54
ApprovedPO sentEst. delivery
Backordered
Melt Cone Fat LED floor lamp by Tom Dixon
Melt Cone Fat LED Floor LampFloor LampZapata Residence
ApprovedNo tags configured4–6 weeks
Living RoomLightingLumens
Unit cost$1,696Qty1Client total$2,204.80Profit$165.36
ApprovedPO sentDeliveredJul 17
129867872387UPS
Camoufleur mural by Milton & King
Camoufleur MuralWallcoveringProject C
ApprovedNo tags configured6–8 weeks
Primary BedroomWallcoveringMilton & King
Unit cost$1,526Qty1Client total$1,983.80Profit$148.79
ApprovedJul 1PO sentJul 8Est. deliveryJul 16
Awaiting ship date
Bronze-gray sectional by Thayer Coggin
Sectional, Bronze GreySectionalWalter Residence
ApprovedNo tags configured10–12 weeks
Living RoomFurniture » SeatingThayer Coggin
Unit cost$4,501Qty1Client total$7,580.25Profit$2,486.80
ApprovedPO sentEst. delivery
Awaiting ship date

One library across every unit type and every building — filterable by vendor, room or status.

Trusted by the studios doing the work

Six packages
specified once, then carried by every unit that uses them
Staged delivery
orders and receiving grouped by building and release, not by one big date
A durability floor
rules written once and checked against every product specified after
Margin per unit type
which package earns, not which building happened to close first
The unit type is the record

A change to one package is a change to ninety units

The failure mode is always the same. A sofa is discontinued in month four, the unit type gets updated in a schedule, and three buildings later somebody is still ordering the old one because their copy of the spreadsheet was made in March.

Duplicate a unit type onto a new building and it carries the whole record — vendor, model number, finish, lead time, freight rule and its sub-items. Replace a line in the package once and every unit still to be ordered inherits it.

  • Duplicate a unit-type package onto a new building
  • Sub-items travel with the parent product
  • Replace a discontinued line once, not per building
  • Already-ordered units keep their own history

Product library →

Duplicate product×
DuplicatingMolecule Chandelier
Search projects…
Zapata ResidenceCurrent
Robin Residence
Project D
Project E
Walter Residence
Jackson Valley
No location
Dining Room (DR)
Family Room (FR)
Living Room (LV)
Kitchen (KN)
No type
Building Elements » External Door
Building Elements » Internal Door
Lighting » Pendant
Sourcing
wholesale
Also duplicate sub-itemsThis product has 1 sub-item. They’ll be copied onto the new product.
CancelDuplicate
An open-plan kitchen and dining room with a terracotta-tiled island, oak joinery and woven stools, designed by Carrie Moore Interior Design.
The renter sees one apartment. You are delivering this exact package another eighty-nine times.Project by Carrie Moore Interior Design
Repeatable is the point

Specify it once. Deliver it ninety times.

Everything that makes multi-family profitable also makes it fragile: the same package, at volume, with no room to absorb a mistake quietly.

  • One schedule per unit type — every field on the line, so a unit inherits the package rather than a fresh interpretation
  • Substitutions that stick — a discontinued line is replaced in the package, not in six separate schedules
  • Upgrades stay contained — a penthouse variation is a change order against that unit, and the base package stays intact

Products & sourcing →

Delivered in stages

Building C opens whether or not Building D is ready

Nothing lands at once. Buildings release on their own certificates of occupancy, and a delivery that arrives for the wrong phase is a storage bill and a damage claim rather than progress.

Orders and receiving group by building and release. Balances, aging and acknowledgements follow whatever filter you are in, so “what is outstanding on Building C” is a view rather than an afternoon.

  • Filter the order book by building, release or vendor
  • Acknowledgement and receiving state on every row
  • Balances and aging follow the filter
  • Damage and claim windows tracked against the item

Purchase orders →

Purchase Orders146 orders
AllSentPendingArchived Search PO #, vendor, project… + Create Purchase Order
Project All projects Client All clients Vendor Lumens 12 results  ·  Page 1 of 2
PO #DateLotBalanceStatusVendorLinkedQB sync
PO-ASPN-118Jul 22, 2026Aspen 42Lot 118 · Carter Ridge$4,180.00SentLumens🔗
PO-ASPN-121Jul 22, 2026Aspen 42Lot 121 · Carter Ridge$4,180.00SentLumens🔗
PO-ASPN-124Jul 22, 2026Aspen 42Lot 124 · Carter Ridge$4,180.00AcknowledgementLumens🔗
PO-BIRC-203Jul 18, 2026Birch 30Lot 203 · Halloway$3,640.00DraftLumens🔗
PO-BIRC-207Jul 18, 2026Birch 30Lot 207 · Halloway$3,640.00DraftLumens🔗
PO-BIRC-211Jul 18, 2026Birch 30Lot 211 · Halloway$3,640.00DraftLumens🔗
PO-CEDR-309Jul 15, 2026Cedar 55Lot 309 · Halloway$5,920.00PaidLumens🔗
PO-CEDR-312Jul 15, 2026Cedar 55Lot 312 · Halloway$5,920.00AcknowledgementLumens🔗

Five of these eight are not yet acknowledged. A 6% increase from this vendor would reach $1,156.80 across the open lines on this filter alone.

The durability floor

In build-to-rent, the spec is the warranty

Everything you specify gets used harder than it would in a home and replaced on a schedule somebody has already budgeted. A fabric that fails early is not an apology and a re-order — it is the same wrong fabric in every unit, discovered after turnover.

Write the floor as a sentence and Walter reads every product specification against it. A rub count, a contract rating, a lead-time ceiling. Nothing is blocked; the flag sits on the record where whoever reviews it will see it.

  • Rules in plain English, not a conditions builder
  • Scoped to a category or applied to everything
  • Checked against every product specified after
  • Findings, not hard blocks — you keep the judgement

Brand standards →

Brand standards Define the spec standards Walter checks products against, and review what got flagged.
StandardsFindings
Add a standard Write the rule in plain English — Walter reads product specs and flags what doesn’t meet it.
Fabric durability
All guestroom fabrics must be at least 100,000 double rubs.
Leave blank for all categories
Warning
Add standard
Your standards 5 active
Fabric durability All guestroom fabrics must be at least 100,000 double rubs. TextilesWarning
Casegoods grade All casegoods must be AWI Premium Grade. FurnitureWarning
Contract-rated seating Any seating in a lobby, bar or restaurant must carry a commercial contract rating. Furniture » SeatingWarning
Corridor wallcovering Wallcoverings in corridors and exit routes must be Class A to ASTM E84. WallcoveringWarning
Lead time ceiling Nothing over 16 weeks without written sign-off from the project lead. All categoriesWarning

Or just tell Walter — “add a standard: all casegoods must be AWI Premium Grade.”

Which package actually earns

Volume hides margin better than anything else

A unit type that moves fastest can be the one carrying the thinnest package. At three hundred units the difference compounds quietly, and without a per-project audit it stays invisible until the year closes.

Workroom audits the same way every time — profit and margin, quoted against actual, best and worst category — so the comparison between unit types is evidence rather than instinct.

  • Budget per building and per unit type
  • Committed against available, live from product status
  • Target margins the audit measures against
  • A suggested rate for the next release

Live project audit →

Budget · ProductsZapata Residence
Sourcing$3,6824 items
Approved$18,8608 items
On the move$00 items
Complete$00 items
Not approved$00 items
Vendor payments due$27,754across 6 POs
Total profit$3,72716.5% avg margin
Rooms2750 sq ft
Dining RoomRoom budget$4,000
92% · $3,682 committed$318 available
Family RoomRoom budget$75,000
0% · $0 committed$75,000 available

Buckets refresh from product status and timelogs — nobody maintains this.

Questions we hear

Multi-family, specifically answered

Can one package be reused across buildings?

Yes. A unit type’s finish and FF&E schedule is a set of records, so a new building starts from the package rather than a blank sheet — carrying vendor, model number, finish, lead time, freight and sub-items with it.

What happens when a line is discontinued mid-rollout?

You replace it in the package once. Units already ordered keep their own history and their own purchase orders; everything still to be ordered inherits the replacement.

Can we track receiving by building rather than by project?

Yes. Purchase orders, acknowledgements and receiving all filter by building and release, and balances and aging follow the filter you are in.

Is Workroom a construction management system?

No. It does not do takeoffs, bid levelling or field daily logs. It holds the specification, the procurement, the trade bills, the change orders and the money — the half most developers and their design teams currently run in spreadsheets.

How do penthouse or accessible-unit variations work?

As a change order against that unit, so the base package is never edited by a single variation. Approved changes crossing a share of the contracted budget flag automatically.

For teams delivering the same home repeatedly

Bring us one unit type and the buildings running it.

We will set the package up on the call, then filter it by vendor and by building — and you can see exactly what one substitution would touch across the release.